In a bold statement, the Secretary of Information Technology (IT) has dismissed media reports claiming the firewall system, designed to block inappropriate content, was deactivated prior to the 5G launch. This declaration, made during a National Assembly committee meeting, has sparked curiosity and debate.
But here's the controversial part: The Secretary's assertion contradicts recent news reports, leaving many wondering about the truth. During the meeting, committee member Sadiq Memon raised concerns about the firewall's status before the 5G auction, questioning whether the two events were in conflict. He also inquired about the firewall's performance and whether it met its objectives.
The committee chairman, Aminul Haque, requested an update on the 5G spectrum auction from the Pakistan Telecommunication Authority (PTA). The PTA chairman revealed that three major telecom operators had submitted their bids. Amir Shehzad, the DG Licensing PTA, explained that six bands would be offered during the auction, and a consultant's report had guided the government's policy decision. The PTA subsequently released an information memorandum.
The auction's deadline for bid submission is fast approaching, with the 5G auction set to take place at an Islamabad hotel on March 10. Interestingly, the DG mentioned that post-auction, 4G download speeds would be reduced to 20 MBPS.
An advisory committee is overseeing the 5G auction process, ensuring all aspects are thoroughly considered. PTA officials assured the committee of their efforts to enhance service quality.
As the 5G rollout unfolds, this controversy over the firewall's status adds an intriguing twist. What do you think about the Secretary's statement? Is it a necessary clarification or a cause for concern? Share your thoughts below, and let's explore the implications together.